GAS REGIONAL INVESTMENT PLAN (GRIPS)

The requirement to promote regional cooperation is enshrined in EU Directive 2009/73/EC and further detailed by EU Gas Regulation (EC) 715/2009, which requires European TSOs to publish Gas Regional Investment Plans (GRIPs) on a biennial basis.

Based on an analysis of transmission system interconnections and operation, as well as infrastructure development needs, the ENTSOG TSOs agreed on six regional groupings, in some cases overlapping, to develop the first GRIPS.

Six Regional Groupings:

  • GRIP North-West: coordinator GTS (NL)
  • GRIP South: coordinator GRTgaz (FR)
  • GRIP CEE: coord. BOG (AT) & GAZ-SYSTEM (PL)
  • GRIP BEMIP: coordinator Amber Grid (LT)
  • GRIP Southern Corridor: coordinator DESFA (GR)
  • GRIP South-North Corridor: coord. SRG (IT) & Fluxys (BE)

For further information, please contact:

Louis Watine - Deputy Business Area Manager, System Development

Louis.Watine@entsog.eu 
T +32 (0)2 894 51 15